EnterIT Book a call ENCZDEPL
Back to the overview Ready-made solutions · Timesheets

Field timesheets, collected, approved and ready to invoice.

The agent collects timesheets, matches each entry to the right job, and prepares both the invoicing and the payroll input.

Field reports on paper and in messages → Approved and ready to bill · ~12 h a month back to the back office

Talk through your version of this
01
Where the time goes

What this looks like today.

If none of these three is familiar, this is probably not your first project — and we would rather tell you that than sell you one.

1 Paper and spreadsheet timesheets get re-keyed by the office.
2 Month-end billing is reconstructed from memory and message threads.
3 Billable hours that were never written down are invisible lost revenue.
A service technician filling in a job sheet on his phone in front of the machine he has just repaired. How it looks today Field timesheets, collected, approved and ready to invoice.

Field reports on paper and in messages → Approved and ready to bill

02
Step by step

How it runs, with the human points named.

Nothing here happens off-screen. Every step has a defined output, and the places a person decides are written down before anything is built.

1 Voice entry

The technician dictates hours, job, activity and materials — twenty seconds on the drive home.

2 Structure

Each entry matched to the correct job.

3 Checks

Attendance, stock issues and missing entries verified against each other.

4 Manager approval

The daily overview takes one click.

5 Billing and payroll

Job, payroll and margin outputs prepared. Discrepancies go to the manager.

03
The limits

What it never does on its own.

This is the part worth reading twice. A system that is allowed to do everything is a system nobody can sign off on.

It does not approve a technician's own timesheet. That always goes to the manager.
It does not bill a customer without the manager's approval.
It does not create new jobs on its own.
And where it runs Your infrastructure or EU cloud. Your call, made before we build.
  • Encrypted in transit and at rest, with on-premises operation available for sensitive data.
  • GDPR and EU AI Act controls designed in at the start.
  • Role-based access, approval steps and a complete audit trail.
04
What we need from you

Three things, and none of them is a project.

The most common reason a pilot slips is waiting on access. This is the whole list.

1 A list of jobs, from the ERP or from a spreadsheet.
2 The technicians' own phones.
3 Your billing rules — rates, what is inside a flat fee and what is on top.
What to expect
4–6 weeksto deploymentfewerforgotten hours~12 h/moback to the officedirectimpact on revenue

A construction group removed manual timesheet entry entirely and got roughly 180 hours a month back.

05
The objections people actually raise

Answered plainly.

Our crews will not type anything into a phone.

Which is exactly why it is voice. Anyone can dictate for twenty seconds.

We bill both flat rates and hourly.

Rules per job. It knows what is inside the flat rate and what goes on top.

06
Your move

Thirty minutes is enough to size this.

We map the process, estimate what it costs you today and tell you whether it is worth automating. You will get an answer either way.

07
The other seven

Same approach, different process.